Verification of the corrosion behaviour of surface coatings and of adhesive bonds.
It is a 7 day cyclic corrosion test (CCT) comprising of the following steps:
Monday: Start of the cycle 24 hours salt spray according to AA-0324.
Tuesday to Friday: 08.00 to 16.00 hrs condense water constant climate at 40°C according to AA-0213.
From 16.00 until 08.00 hrs regeneration at room temperature (opened chamber or ventilated chamber)
Saturday to Sunday: Regeneration at room temperature (opened cha
Verification of the corrosion behaviour of surface coatings and of adhesive bonds.
It is a 7 day cyclic corrosion test (CCT) comprising of the following steps:
Monday: Start of the cycle 24 hours salt spray according to AA-0324.
Tuesday to Friday: 08.00 to 16.00 hrs condense water constant climate at 40°C according to AA-0213.
From 16.00 until 08.00 hrs regeneration at room temperature (opened chamber or ventilated chamber)
Saturday to Sunday: Regeneration at room temperature (opened cha
微信號